Progress Unveiled: From Hillside to Foundation with Sinai Construction

Writer's picture: Isela Isela

Updated: Aug 27, 2024


In this blog post, we showcase the latest advancements in our ADU and retaining wall project. The Sinai Construction team has successfully stabilized the hillside with precisely engineered caissons, which were then covered with concrete. This set the stage for the footings to be laid and the foundation of the ADU to start taking form. With the concrete poured over the footings, we're now poised to commence the actual building phase.


Watch the progress unfold through the videos featured in this blog, illustrating the transformation from a blank canvas to a solid foundation.


If you’re ready to start your own home project, contact Sinai Construction today for an inspection at (323) 655-0960.